West Queue Project 114 — Wind in Wheatland, Montana
West Queue Project 114 — Wind in Wheatland, Montana is a 10.0 MW wind interconnection project in Wheatland, Montana with a current status of withdrawn. It is proposed to connect at 100kV line between Martinsdale and Two Dot Sub.
10.0 MWCapacity
WithdrawnStatus
WestMarket
WindTechnology
Project facts
| Canonical name | West Queue Project 114 — Wind in Wheatland, Montana |
|---|---|
| Queue ID | 114 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | West |
| Technology | Wind |
| Capacity | 10.0 MW |
| State | Montana |
| County | Wheatland |
| Point of interconnection | 100kV line between Martinsdale and Two Dot Sub |
| Requested (queue) date | 2010-03-03 |
| Proposed in-service date | 2011-06-30 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | NorthWestern Energy |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.