West Queue Project 118 — Wind in Golden Valley, Montana
West Queue Project 118 — Wind in Golden Valley, Montana is a 18.4 MW wind interconnection project in Golden Valley, Montana with a current status of operational. It is proposed to connect at 100kV line between Harlowton Sub and Broadview Switchyard.
Project facts
| Canonical name | West Queue Project 118 — Wind in Golden Valley, Montana |
|---|---|
| Queue ID | 118 |
| Status | operational |
| Source status | operational |
| Market | West |
| Technology | Wind |
| Capacity | 18.4 MW |
| State | Montana |
| County | Golden Valley |
| Point of interconnection | 100kV line between Harlowton Sub and Broadview Switchyard |
| Requested (queue) date | 2010-05-05 |
| Proposed in-service date | 2011-06-30 |
| Operational date | 2011-06-30 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | NorthWestern Energy |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata