West Queue Project 119 — Other in Rosebud, Montana

West Queue Project 119 — Other in Rosebud, Montana is a 36.0 MW other interconnection project in Rosebud, Montana with a current status of withdrawn. It is proposed to connect at Tongue River Sub at Ashland.

36.0 MWCapacity
WithdrawnStatus
WestMarket
OtherTechnology

Project facts

Canonical nameWest Queue Project 119 — Other in Rosebud, Montana
Queue ID119
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyOther
Capacity36.0 MW
StateMontana
CountyRosebud
Point of interconnectionTongue River Sub at Ashland
Requested (queue) date2010-07-13
Proposed in-service date2013-01-15
Operational date
Withdrawn date
Developer
Utility / transmission ownerNorthWestern Energy

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata