West Queue Project 12 — Wind in Uinta, Wyoming

West Queue Project 12 — Wind in Uinta, Wyoming is a 146.0 MW wind interconnection project in Uinta, Wyoming with a current status of operational. It is proposed to connect at Longhollow Switching Station.

146.0 MWCapacity
OperationalStatus
WestMarket
WindTechnology

Project facts

Canonical nameWest Queue Project 12 — Wind in Uinta, Wyoming
Queue ID12
Statusoperational
Source statusoperational
MarketWest
TechnologyWind
Capacity146.0 MW
StateWyoming
CountyUinta
Point of interconnectionLonghollow Switching Station
Requested (queue) date2001-08-27
Proposed in-service date2003-12-26
Operational date
Withdrawn date
DeveloperFPL
Utility / transmission ownerPacifiCorp

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata