West Queue Project 1212 — Solar+Battery in Bear Lake, Idaho
West Queue Project 1212 — Solar+Battery in Bear Lake, Idaho is a 350.0 MW solar+battery interconnection project in Bear Lake, Idaho with a current status of withdrawn. It is proposed to connect at Naughton-Treasureton transmission line.
350.0 MWCapacity
WithdrawnStatus
WestMarket
Solar+BatteryTechnology
Project facts
| Canonical name | West Queue Project 1212 — Solar+Battery in Bear Lake, Idaho |
|---|---|
| Queue ID | 1212 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | West |
| Technology | Solar+Battery |
| Capacity | 350.0 MW |
| State | Idaho |
| County | Bear Lake |
| Point of interconnection | Naughton-Treasureton transmission line |
| Requested (queue) date | 2020-04-10 |
| Proposed in-service date | 2023-09-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | PacifiCorp |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.