West Queue Project 130 — Battery in Pima, Arizona

West Queue Project 130 — Battery in Pima, Arizona is a 100.0 MW battery interconnection project in Pima, Arizona with a current status of withdrawn. It is proposed to connect at Midvale-Drexel 138kV Transmission Line.

100.0 MWCapacity
WithdrawnStatus
WestMarket
BatteryTechnology

Project facts

Canonical nameWest Queue Project 130 — Battery in Pima, Arizona
Queue ID130
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyBattery
Capacity100.0 MW
StateArizona
CountyPima
Point of interconnectionMidvale-Drexel 138kV Transmission Line
Requested (queue) date2022-07-14
Proposed in-service date2025-02-26
Operational date
Withdrawn date
Developer
Utility / transmission ownerTucson Electric Power Company

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata