West Queue Project 134 — Wind in Teton, Montana

West Queue Project 134 — Wind in Teton, Montana is a 10.0 MW wind interconnection project in Teton, Montana with a current status of operational. It is proposed to connect at 69kV line East of Bole Substation.

10.0 MWCapacity
OperationalStatus
WestMarket
WindTechnology

Project facts

Canonical nameWest Queue Project 134 — Wind in Teton, Montana
Queue ID134
Statusoperational
Source statusoperational
MarketWest
TechnologyWind
Capacity10.0 MW
StateMontana
CountyTeton
Point of interconnection69kV line East of Bole Substation
Requested (queue) date2011-03-18
Proposed in-service date2012-05-01
Operational date2012-05-01
Withdrawn date
Developer
Utility / transmission ownerNorthWestern Energy

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata