West Queue Project 134 — Gas+Coal in Carbon, Wyoming
West Queue Project 134 — Gas+Coal in Carbon, Wyoming is a 430.0 MW gas+coal interconnection project in Carbon, Wyoming with a current status of withdrawn. It is proposed to connect at Foote-Creek-Miners line.
430.0 MWCapacity
WithdrawnStatus
WestMarket
Gas+CoalTechnology
Project facts
| Canonical name | West Queue Project 134 — Gas+Coal in Carbon, Wyoming |
|---|---|
| Queue ID | 134 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | West |
| Technology | Gas+Coal |
| Capacity | 430.0 MW |
| State | Wyoming |
| County | Carbon |
| Point of interconnection | Foote-Creek-Miners line |
| Requested (queue) date | 2007-05-16 |
| Proposed in-service date | 2010-12-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Clipper Windpower |
| Utility / transmission owner | PacifiCorp |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata