West Queue Project 143 — Wind in Uinta, Wyoming

West Queue Project 143 — Wind in Uinta, Wyoming is a 79.8 MW wind interconnection project in Uinta, Wyoming with a current status of withdrawn. It is proposed to connect at Muddy Creek Switching station on the Long Hollow-Naughton Line.

79.8 MWCapacity
WithdrawnStatus
WestMarket
WindTechnology

Project facts

Canonical nameWest Queue Project 143 — Wind in Uinta, Wyoming
Queue ID143
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyWind
Capacity79.8 MW
StateWyoming
CountyUinta
Point of interconnectionMuddy Creek Switching station on the Long Hollow-Naughton Line
Requested (queue) date2007-06-22
Proposed in-service date2009-12-31
Operational date
Withdrawn date2010-10-27
Developer
Utility / transmission ownerPacifiCorp

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata