West Queue Project 166 — Solar+Battery in Graham, Arizona
West Queue Project 166 — Solar+Battery in Graham, Arizona is a 485.0 MW solar+battery interconnection project in Graham, Arizona with a current status of withdrawn. It is proposed to connect at Greenlee-Winchester 345kV Transmission Line.
485.0 MWCapacity
WithdrawnStatus
WestMarket
Solar+BatteryTechnology
Project facts
| Canonical name | West Queue Project 166 — Solar+Battery in Graham, Arizona |
|---|---|
| Queue ID | 166 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | West |
| Technology | Solar+Battery |
| Capacity | 485.0 MW |
| State | Arizona |
| County | Graham |
| Point of interconnection | Greenlee-Winchester 345kV Transmission Line |
| Requested (queue) date | 2024-04-17 |
| Proposed in-service date | 2028-02-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Tucson Electric Power Company |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata