West Queue Project 167 — Hydro in Broadwater, Montana

West Queue Project 167 — Hydro in Broadwater, Montana is a 9.8 MW hydro interconnection project in Broadwater, Montana with a current status of withdrawn. It is proposed to connect at Spokane Bench 12.47kV Distribution system near Canyon Ferry Dam.

9.8 MWCapacity
WithdrawnStatus
WestMarket
HydroTechnology

Project facts

Canonical nameWest Queue Project 167 — Hydro in Broadwater, Montana
Queue ID167
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyHydro
Capacity9.8 MW
StateMontana
CountyBroadwater
Point of interconnectionSpokane Bench 12.47kV Distribution system near Canyon Ferry Dam
Requested (queue) date2013-11-27
Proposed in-service date2016-04-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerNorthWestern Energy

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata