West Queue Project 167 — Hydro in Broadwater, Montana
West Queue Project 167 — Hydro in Broadwater, Montana is a 9.8 MW hydro interconnection project in Broadwater, Montana with a current status of withdrawn. It is proposed to connect at Spokane Bench 12.47kV Distribution system near Canyon Ferry Dam.
9.8 MWCapacity
WithdrawnStatus
WestMarket
HydroTechnology
Project facts
| Canonical name | West Queue Project 167 — Hydro in Broadwater, Montana |
|---|---|
| Queue ID | 167 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | West |
| Technology | Hydro |
| Capacity | 9.8 MW |
| State | Montana |
| County | Broadwater |
| Point of interconnection | Spokane Bench 12.47kV Distribution system near Canyon Ferry Dam |
| Requested (queue) date | 2013-11-27 |
| Proposed in-service date | 2016-04-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | NorthWestern Energy |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata