West Queue Project 170 — Wind+Gas in Big Horn, Montana
West Queue Project 170 — Wind+Gas in Big Horn, Montana is a 62.5 MW wind+gas interconnection project in Big Horn, Montana with a current status of withdrawn. It is proposed to connect at NWE's 230kV Line-15 miles East of the South Huntley Substation, and 10 miles West of the Crossover Substation.
Project facts
| Canonical name | West Queue Project 170 — Wind+Gas in Big Horn, Montana |
|---|---|
| Queue ID | 170 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | West |
| Technology | Wind+Gas |
| Capacity | 62.5 MW |
| State | Montana |
| County | Big Horn |
| Point of interconnection | NWE's 230kV Line-15 miles East of the South Huntley Substation, and 10 miles West of the Crossover Substation |
| Requested (queue) date | 2014-07-09 |
| Proposed in-service date | 2016-04-16 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | NorthWestern Energy |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata