West Queue Project 173 — Gas in Lewis And Clark, Montana
West Queue Project 173 — Gas in Lewis And Clark, Montana is a 60.0 MW gas interconnection project in Lewis And Clark, Montana with a current status of withdrawn. It is proposed to connect at Secondary side of existing NWE transformer feeding the Training Support Facility.
Project facts
| Canonical name | West Queue Project 173 — Gas in Lewis And Clark, Montana |
|---|---|
| Queue ID | 173 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | West |
| Technology | Gas |
| Capacity | 60.0 MW |
| State | Montana |
| County | Lewis And Clark |
| Point of interconnection | Secondary side of existing NWE transformer feeding the Training Support Facility |
| Requested (queue) date | 2014-09-26 |
| Proposed in-service date | 2014-11-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | NorthWestern Energy |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata