West Queue Project 175 — Wind in Lincoln, Wyoming

West Queue Project 175 — Wind in Lincoln, Wyoming is a 150.0 MW wind interconnection project in Lincoln, Wyoming with a current status of withdrawn. It is proposed to connect at Craven Creek substation.

150.0 MWCapacity
WithdrawnStatus
WestMarket
WindTechnology

Project facts

Canonical nameWest Queue Project 175 — Wind in Lincoln, Wyoming
Queue ID175
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyWind
Capacity150.0 MW
StateWyoming
CountyLincoln
Point of interconnectionCraven Creek substation
Requested (queue) date2007-12-07
Proposed in-service date2011-10-01
Operational date
Withdrawn date2014-02-17
Developer
Utility / transmission ownerPacifiCorp

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata