West Queue Project 2002-03-01 00:00:00 — Gas+Battery+Other Storage in Laramie, Wyoming

West Queue Project 2002-03-01 00:00:00 — Gas+Battery+Other Storage in Laramie, Wyoming is a 600.0 MW gas+battery+other storage interconnection project in Laramie, Wyoming with a current status of active. It is proposed to connect at Tap 230 kV transmission line between West Cheyenne and Sweetgrass substations 2 miles from Sweetgrass substation..

600.0 MWCapacity
ActiveStatus
WestMarket
Gas+Battery+Other StorageTechnology

Project facts

Canonical nameWest Queue Project 2002-03-01 00:00:00 — Gas+Battery+Other Storage in Laramie, Wyoming
Queue ID2002-03-01 00:00:00
Statusactive
Source statusactive
MarketWest
TechnologyGas+Battery+Other Storage
Capacity600.0 MW
StateWyoming
CountyLaramie
Point of interconnectionTap 230 kV transmission line between West Cheyenne and Sweetgrass substations 2 miles from Sweetgrass substation.
Requested (queue) date2025-07-29
Proposed in-service date2027-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerBlack Hills Cheyenne Light Fuel and Power Transmission

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata