West Queue Project 2002-03-01 00:00:00 — Gas+Battery+Other Storage in Laramie, Wyoming
West Queue Project 2002-03-01 00:00:00 — Gas+Battery+Other Storage in Laramie, Wyoming is a 600.0 MW gas+battery+other storage interconnection project in Laramie, Wyoming with a current status of active. It is proposed to connect at Tap 230 kV transmission line between West Cheyenne and Sweetgrass substations 2 miles from Sweetgrass substation..
Project facts
| Canonical name | West Queue Project 2002-03-01 00:00:00 — Gas+Battery+Other Storage in Laramie, Wyoming |
|---|---|
| Queue ID | 2002-03-01 00:00:00 |
| Status | active |
| Source status | active |
| Market | West |
| Technology | Gas+Battery+Other Storage |
| Capacity | 600.0 MW |
| State | Wyoming |
| County | Laramie |
| Point of interconnection | Tap 230 kV transmission line between West Cheyenne and Sweetgrass substations 2 miles from Sweetgrass substation. |
| Requested (queue) date | 2025-07-29 |
| Proposed in-service date | 2027-12-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Black Hills Cheyenne Light Fuel and Power Transmission |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata