West Queue Project 203 — Solar in Stillwater, Montana
West Queue Project 203 — Solar in Stillwater, Montana is a 2.0 MW solar interconnection project in Stillwater, Montana with a current status of operational. It is proposed to connect at Reed Point Substation, Reed Point.
2.0 MWCapacity
OperationalStatus
WestMarket
SolarTechnology
Project facts
| Canonical name | West Queue Project 203 — Solar in Stillwater, Montana |
|---|---|
| Queue ID | 203 |
| Status | operational |
| Source status | operational |
| Market | West |
| Technology | Solar |
| Capacity | 2.0 MW |
| State | Montana |
| County | Stillwater |
| Point of interconnection | Reed Point Substation, Reed Point |
| Requested (queue) date | 2015-04-24 |
| Proposed in-service date | 2016-04-01 |
| Operational date | 2016-04-01 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | NorthWestern Energy |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata