West Queue Project 21 — Other in Shoshone, Idaho

West Queue Project 21 — Other in Shoshone, Idaho is a 13.0 MW other interconnection project in Shoshone, Idaho with a current status of withdrawn. It is proposed to connect at Pine Creek 115 kV Substation.

13.0 MWCapacity
WithdrawnStatus
WestMarket
OtherTechnology

Project facts

Canonical nameWest Queue Project 21 — Other in Shoshone, Idaho
Queue ID21
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyOther
Capacity13.0 MW
StateIdaho
CountyShoshone
Point of interconnectionPine Creek 115 kV Substation
Requested (queue) date2009-07-27
Proposed in-service date2011-06-30
Operational date
Withdrawn date2009-11-13
Developer
Utility / transmission ownerAvista Utilities

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata