West Queue Project 25-00421 — Solar+Battery in Mohave, Arizona

West Queue Project 25-00421 — Solar+Battery in Mohave, Arizona is a 500.0 MW solar+battery interconnection project in Mohave, Arizona with a current status of active.

500.0 MWCapacity
ActiveStatus
WestMarket
Solar+BatteryTechnology

Project facts

Canonical nameWest Queue Project 25-00421 — Solar+Battery in Mohave, Arizona
Queue ID25-00421
Statusactive
Source statusactive
MarketWest
TechnologySolar+Battery
Capacity500.0 MW
StateArizona
CountyMohave
Point of interconnection
Requested (queue) date2025-07-30
Proposed in-service date2029-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerNV Energy (Nevada Power / Sierra Pacific Power)

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata