West Queue Project 255 — Geothermal in Elko, Nevada

West Queue Project 255 — Geothermal in Elko, Nevada is a 19.9 MW geothermal interconnection project in Elko, Nevada with a current status of withdrawn. It is proposed to connect at undefined.

19.9 MWCapacity
WithdrawnStatus
WestMarket
GeothermalTechnology

Project facts

Canonical nameWest Queue Project 255 — Geothermal in Elko, Nevada
Queue ID255
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyGeothermal
Capacity19.9 MW
StateNevada
CountyElko
Point of interconnectionundefined
Requested (queue) date2008-06-06
Proposed in-service date2013-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerIdaho Power Company

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata