West Queue Project 283 — Geothermal in Twin Falls, Idaho

West Queue Project 283 — Geothermal in Twin Falls, Idaho is a 100.0 MW geothermal interconnection project in Twin Falls, Idaho with a current status of withdrawn. It is proposed to connect at tbd.

100.0 MWCapacity
WithdrawnStatus
WestMarket
GeothermalTechnology

Project facts

Canonical nameWest Queue Project 283 — Geothermal in Twin Falls, Idaho
Queue ID283
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyGeothermal
Capacity100.0 MW
StateIdaho
CountyTwin Falls
Point of interconnectiontbd
Requested (queue) date2009-03-10
Proposed in-service date2010-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerIdaho Power Company

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata