West Queue Project 29-A — Wind in Bonneville, Idaho is a 64.5 MW wind interconnection project in Bonneville, Idaho with a current status of operational. It is proposed to connect at Goshen substation (Idaho).

64.5 MWCapacity
OperationalStatus
WestMarket
WindTechnology

Project facts

Canonical nameWest Queue Project 29-A — Wind in Bonneville, Idaho
Queue ID29-A
Statusoperational
Source statusoperational
MarketWest
TechnologyWind
Capacity64.5 MW
StateIdaho
CountyBonneville
Point of interconnectionGoshen substation (Idaho)
Requested (queue) date2003-09-18
Proposed in-service date2006-02-12
Operational date
Withdrawn date
DeveloperWolverine Creek Goshen Interconnection, LLC
Utility / transmission ownerPacifiCorp

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.