West Queue Project 29 — Gas in Bonner, Idaho

West Queue Project 29 — Gas in Bonner, Idaho is a 6.0 MW gas interconnection project in Bonner, Idaho with a current status of withdrawn. It is proposed to connect at Oldtown 115 kV Substation at 13 kV or 24 kV.

6.0 MWCapacity
WithdrawnStatus
WestMarket
GasTechnology

Project facts

Canonical nameWest Queue Project 29 — Gas in Bonner, Idaho
Queue ID29
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyGas
Capacity6.0 MW
StateIdaho
CountyBonner
Point of interconnectionOldtown 115 kV Substation at 13 kV or 24 kV
Requested (queue) date2010-07-29
Proposed in-service date2012-12-01
Operational date
Withdrawn date2010-03-24
Developer
Utility / transmission ownerAvista Utilities

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata