West Queue Project 300 — Wind+Battery in Stillwater, Montana
West Queue Project 300 — Wind+Battery in Stillwater, Montana is a 315.0 MW wind+battery interconnection project in Stillwater, Montana with a current status of active. It is proposed to connect at 230kV Line between Wilsall and Columbus Rapelje Substations.
Project facts
| Canonical name | West Queue Project 300 — Wind+Battery in Stillwater, Montana |
|---|---|
| Queue ID | 300 |
| Status | active |
| Source status | active |
| Market | West |
| Technology | Wind+Battery |
| Capacity | 315.0 MW |
| State | Montana |
| County | Stillwater |
| Point of interconnection | 230kV Line between Wilsall and Columbus Rapelje Substations |
| Requested (queue) date | 2016-07-11 |
| Proposed in-service date | 2020-08-15 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | NorthWestern Energy |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata