West Queue Project 305 — Solar in Silver Bow, Montana

West Queue Project 305 — Solar in Silver Bow, Montana is a 3.0 MW solar interconnection project in Silver Bow, Montana with a current status of withdrawn. It is proposed to connect at Industrial Park Substation.

3.0 MWCapacity
WithdrawnStatus
WestMarket
SolarTechnology

Project facts

Canonical nameWest Queue Project 305 — Solar in Silver Bow, Montana
Queue ID305
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar
Capacity3.0 MW
StateMontana
CountySilver Bow
Point of interconnectionIndustrial Park Substation
Requested (queue) date2016-11-10
Proposed in-service date2017-10-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerNorthWestern Energy

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata