West Queue Project 310 — Other Storage in Meagher, Montana
West Queue Project 310 — Other Storage in Meagher, Montana is a 450.0 MW other storage interconnection project in Meagher, Montana with a current status of suspended. It is proposed to connect at New 500kV Substation between Broadview and Townsend.
450.0 MWCapacity
SuspendedStatus
WestMarket
Other StorageTechnology
Project facts
| Canonical name | West Queue Project 310 — Other Storage in Meagher, Montana |
|---|---|
| Queue ID | 310 |
| Status | suspended |
| Source status | suspended |
| Market | West |
| Technology | Other Storage |
| Capacity | 450.0 MW |
| State | Montana |
| County | Meagher |
| Point of interconnection | New 500kV Substation between Broadview and Townsend |
| Requested (queue) date | 2016-12-21 |
| Proposed in-service date | 2023-02-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | NorthWestern Energy |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.