West Queue Project 33 — Wind in Adams, Washington
West Queue Project 33 — Wind in Adams, Washington is a 250.0 MW wind interconnection project in Adams, Washington with a current status of withdrawn. It is proposed to connect at A 115 kV interconnection Near Lind 115 kV Substation.
250.0 MWCapacity
WithdrawnStatus
WestMarket
WindTechnology
Project facts
| Canonical name | West Queue Project 33 — Wind in Adams, Washington |
|---|---|
| Queue ID | 33 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | West |
| Technology | Wind |
| Capacity | 250.0 MW |
| State | Washington |
| County | Adams |
| Point of interconnection | A 115 kV interconnection Near Lind 115 kV Substation |
| Requested (queue) date | 2011-02-18 |
| Proposed in-service date | 2017-11-01 |
| Operational date | — |
| Withdrawn date | 2013-10-03 |
| Developer | — |
| Utility / transmission owner | Avista Utilities |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata