West Queue Project 335 — Solar+Wind in Ada, Idaho

West Queue Project 335 — Solar+Wind in Ada, Idaho is a 20.0 MW solar+wind interconnection project in Ada, Idaho with a current status of withdrawn. It is proposed to connect at 138kV.

20.0 MWCapacity
WithdrawnStatus
WestMarket
Solar+WindTechnology

Project facts

Canonical nameWest Queue Project 335 — Solar+Wind in Ada, Idaho
Queue ID335
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar+Wind
Capacity20.0 MW
StateIdaho
CountyAda
Point of interconnection138kV
Requested (queue) date2010-06-16
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerIdaho Power Company

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata