West Queue Project 344 — Hydro in Fremont, Idaho

West Queue Project 344 — Hydro in Fremont, Idaho is a 3.6 MW hydro interconnection project in Fremont, Idaho with a current status of withdrawn. It is proposed to connect at Circuit STA13, out of St. Anthony substation.

3.6 MWCapacity
WithdrawnStatus
WestMarket
HydroTechnology

Project facts

Canonical nameWest Queue Project 344 — Hydro in Fremont, Idaho
Queue ID344
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyHydro
Capacity3.6 MW
StateIdaho
CountyFremont
Point of interconnectionCircuit STA13, out of St. Anthony substation
Requested (queue) date2010-06-23
Proposed in-service date2012-01-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.