West Queue Project 349 — Wind in Meagher, Montana
West Queue Project 349 — Wind in Meagher, Montana is a 3.0 MW wind interconnection project in Meagher, Montana with a current status of operational. It is proposed to connect at 100kV line between Loweth and Two Dot at Groveland..
3.0 MWCapacity
OperationalStatus
WestMarket
WindTechnology
Project facts
| Canonical name | West Queue Project 349 — Wind in Meagher, Montana |
|---|---|
| Queue ID | 349 |
| Status | operational |
| Source status | operational |
| Market | West |
| Technology | Wind |
| Capacity | 3.0 MW |
| State | Montana |
| County | Meagher |
| Point of interconnection | 100kV line between Loweth and Two Dot at Groveland. |
| Requested (queue) date | 2018-07-10 |
| Proposed in-service date | 2018-12-21 |
| Operational date | 2018-12-21 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | NorthWestern Energy |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata