West Queue Project 36 — Wind in Whitman, Washington

West Queue Project 36 — Wind in Whitman, Washington is a 105.0 MW wind interconnection project in Whitman, Washington with a current status of withdrawn. It is proposed to connect at Thornton 230 kV Substation.

105.0 MWCapacity
WithdrawnStatus
WestMarket
WindTechnology

Project facts

Canonical nameWest Queue Project 36 — Wind in Whitman, Washington
Queue ID36
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyWind
Capacity105.0 MW
StateWashington
CountyWhitman
Point of interconnectionThornton 230 kV Substation
Requested (queue) date2012-09-11
Proposed in-service date2016-12-01
Operational date
Withdrawn date2014-01-17
Developer
Utility / transmission ownerAvista Utilities

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata