West Queue Project 360 — Wind in Wheatland, Montana
West Queue Project 360 — Wind in Wheatland, Montana is a 200.0 MW wind interconnection project in Wheatland, Montana with a current status of suspended. It is proposed to connect at 230kV at Judith Gap Auto.
200.0 MWCapacity
SuspendedStatus
WestMarket
WindTechnology
Project facts
| Canonical name | West Queue Project 360 — Wind in Wheatland, Montana |
|---|---|
| Queue ID | 360 |
| Status | suspended |
| Source status | suspended |
| Market | West |
| Technology | Wind |
| Capacity | 200.0 MW |
| State | Montana |
| County | Wheatland |
| Point of interconnection | 230kV at Judith Gap Auto |
| Requested (queue) date | 2019-02-14 |
| Proposed in-service date | 2021-12-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | NorthWestern Energy |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.