West Queue Project 369 — Wind+Battery in Rosebud, Montana

West Queue Project 369 — Wind+Battery in Rosebud, Montana is a 500.0 MW wind+battery interconnection project in Rosebud, Montana with a current status of withdrawn. It is proposed to connect at Colstrip 500kV Substation.

500.0 MWCapacity
WithdrawnStatus
WestMarket
Wind+BatteryTechnology

Project facts

Canonical nameWest Queue Project 369 — Wind+Battery in Rosebud, Montana
Queue ID369
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyWind+Battery
Capacity500.0 MW
StateMontana
CountyRosebud
Point of interconnectionColstrip 500kV Substation
Requested (queue) date2019-11-19
Proposed in-service date2024-09-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerNorthWestern Energy

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.