West Queue Project 38 — Diesel in Jerome, Idaho

West Queue Project 38 — Diesel in Jerome, Idaho is a 28.0 MW diesel interconnection project in Jerome, Idaho with a current status of withdrawn. It is proposed to connect at undefined.

28.0 MWCapacity
WithdrawnStatus
WestMarket
DieselTechnology

Project facts

Canonical nameWest Queue Project 38 — Diesel in Jerome, Idaho
Queue ID38
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyDiesel
Capacity28.0 MW
StateIdaho
CountyJerome
Point of interconnectionundefined
Requested (queue) date2001-05-04
Proposed in-service date2001-02-02
Operational date
Withdrawn date
Developer
Utility / transmission ownerIdaho Power Company

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata