West Queue Project 381 — Battery in Deer Lodge, Montana
West Queue Project 381 — Battery in Deer Lodge, Montana is a 150.0 MW battery interconnection project in Deer Lodge, Montana with a current status of withdrawn. It is proposed to connect at Anaconda 230kV.
150.0 MWCapacity
WithdrawnStatus
WestMarket
BatteryTechnology
Project facts
| Canonical name | West Queue Project 381 — Battery in Deer Lodge, Montana |
|---|---|
| Queue ID | 381 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | West |
| Technology | Battery |
| Capacity | 150.0 MW |
| State | Montana |
| County | Deer Lodge |
| Point of interconnection | Anaconda 230kV |
| Requested (queue) date | 2020-06-03 |
| Proposed in-service date | 2023-01-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | NorthWestern Energy |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata