West Queue Project 388 — Solar+Battery in Cascade, Montana

West Queue Project 388 — Solar+Battery in Cascade, Montana is a 200.0 MW solar+battery interconnection project in Cascade, Montana with a current status of withdrawn. It is proposed to connect at 230kV line in Cascade County.

200.0 MWCapacity
WithdrawnStatus
WestMarket
Solar+BatteryTechnology

Project facts

Canonical nameWest Queue Project 388 — Solar+Battery in Cascade, Montana
Queue ID388
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar+Battery
Capacity200.0 MW
StateMontana
CountyCascade
Point of interconnection230kV line in Cascade County
Requested (queue) date2020-07-02
Proposed in-service date2023-09-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerNorthWestern Energy

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata