West Queue Project 391 — Wind in an unlisted county, the U.S.

West Queue Project 391 — Wind in an unlisted county, the U.S. is a 750.0 MW wind interconnection project with a current status of suspended. It is proposed to connect at New proposed 500kV Substation between Broadview and Townsend.

750.0 MWCapacity
SuspendedStatus
WestMarket
WindTechnology

Project facts

Canonical nameWest Queue Project 391 — Wind in an unlisted county, the U.S.
Queue ID391
Statussuspended
Source statussuspended
MarketWest
TechnologyWind
Capacity750.0 MW
State
County
Point of interconnectionNew proposed 500kV Substation between Broadview and Townsend
Requested (queue) date2020-08-26
Proposed in-service date2023-10-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerNorthWestern Energy

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata