West Queue Project 392 — Gas in Yellowstone, Montana

West Queue Project 392 — Gas in Yellowstone, Montana is a 168.0 MW gas interconnection project in Yellowstone, Montana with a current status of withdrawn. It is proposed to connect at Billings Swtichyard.

168.0 MWCapacity
WithdrawnStatus
WestMarket
GasTechnology

Project facts

Canonical nameWest Queue Project 392 — Gas in Yellowstone, Montana
Queue ID392
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyGas
Capacity168.0 MW
StateMontana
CountyYellowstone
Point of interconnectionBillings Swtichyard
Requested (queue) date2020-09-08
Proposed in-service date2023-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerNorthWestern Energy

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata