West Queue Project 410 — Hydro in Gooding, Idaho

West Queue Project 410 — Hydro in Gooding, Idaho is a 1.2 MW hydro interconnection project in Gooding, Idaho with a current status of operational. It is proposed to connect at 34.5.

1.2 MWCapacity
OperationalStatus
WestMarket
HydroTechnology

Project facts

Canonical nameWest Queue Project 410 — Hydro in Gooding, Idaho
Queue ID410
Statusoperational
Source statusoperational
MarketWest
TechnologyHydro
Capacity1.2 MW
StateIdaho
CountyGooding
Point of interconnection34.5
Requested (queue) date2013-07-26
Proposed in-service date2016-12-14
Operational date
Withdrawn date
Developer
Utility / transmission ownerIdaho Power Company

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.