West Queue Project 416 — Solar+Battery in Broadwater, Montana

West Queue Project 416 — Solar+Battery in Broadwater, Montana is a 160.0 MW solar+battery interconnection project in Broadwater, Montana with a current status of suspended. It is proposed to connect at Three Rivers 230kV Substation.

160.0 MWCapacity
SuspendedStatus
WestMarket
Solar+BatteryTechnology

Project facts

Canonical nameWest Queue Project 416 — Solar+Battery in Broadwater, Montana
Queue ID416
Statussuspended
Source statussuspended
MarketWest
TechnologySolar+Battery
Capacity160.0 MW
StateMontana
CountyBroadwater
Point of interconnectionThree Rivers 230kV Substation
Requested (queue) date2021-09-24
Proposed in-service date2023-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerNorthWestern Energy

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata