West Queue Project 43 — Wind in Adams, Washington

West Queue Project 43 — Wind in Adams, Washington is a 150.0 MW wind interconnection project in Adams, Washington with a current status of withdrawn. It is proposed to connect at A 115 kV interconnection Near Lind 115 kV Substation.

150.0 MWCapacity
WithdrawnStatus
WestMarket
WindTechnology

Project facts

Canonical nameWest Queue Project 43 — Wind in Adams, Washington
Queue ID43
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyWind
Capacity150.0 MW
StateWashington
CountyAdams
Point of interconnectionA 115 kV interconnection Near Lind 115 kV Substation
Requested (queue) date2014-12-15
Proposed in-service date2016-12-31
Operational date
Withdrawn date2015-12-23
Developer
Utility / transmission ownerAvista Utilities

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata