West Queue Project 457 — Hydro in Lewis And Clark, Montana

West Queue Project 457 — Hydro in Lewis And Clark, Montana is a 2.2 MW hydro interconnection project in Lewis And Clark, Montana with a current status of active. It is proposed to connect at Hauser Dam Substation.

2.2 MWCapacity
ActiveStatus
WestMarket
HydroTechnology

Project facts

Canonical nameWest Queue Project 457 — Hydro in Lewis And Clark, Montana
Queue ID457
Statusactive
Source statusactive
MarketWest
TechnologyHydro
Capacity2.2 MW
StateMontana
CountyLewis And Clark
Point of interconnectionHauser Dam Substation
Requested (queue) date2024-03-13
Proposed in-service date2025-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerNorthWestern Energy

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata