West Queue Project 461 — Solar in Musselshell, Montana is a 1.0 MW solar interconnection project in Musselshell, Montana with a current status of withdrawn. It is proposed to connect at Jim Coulee Substation.

1.0 MWCapacity
WithdrawnStatus
WestMarket
SolarTechnology

Project facts

Canonical nameWest Queue Project 461 — Solar in Musselshell, Montana
Queue ID461
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar
Capacity1.0 MW
StateMontana
CountyMusselshell
Point of interconnectionJim Coulee Substation
Requested (queue) date2024-05-20
Proposed in-service date2024-10-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerNorthWestern Energy

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata