West Queue Project 52 — Wind in Sweet Grass, Montana

West Queue Project 52 — Wind in Sweet Grass, Montana is a 80.0 MW wind interconnection project in Sweet Grass, Montana with a current status of withdrawn. It is proposed to connect at 161kV line between Big Timber and Clyde Park Substations.

80.0 MWCapacity
WithdrawnStatus
WestMarket
WindTechnology

Project facts

Canonical nameWest Queue Project 52 — Wind in Sweet Grass, Montana
Queue ID52
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyWind
Capacity80.0 MW
StateMontana
CountySweet Grass
Point of interconnection161kV line between Big Timber and Clyde Park Substations
Requested (queue) date2006-09-18
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerNorthWestern Energy

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata