West Queue Project 53 — Gas in Pima, Arizona

West Queue Project 53 — Gas in Pima, Arizona is a 226.0 MW gas interconnection project in Pima, Arizona with a current status of withdrawn. It is proposed to connect at North Loop 138 kV Substation.

226.0 MWCapacity
WithdrawnStatus
WestMarket
GasTechnology

Project facts

Canonical nameWest Queue Project 53 — Gas in Pima, Arizona
Queue ID53
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyGas
Capacity226.0 MW
StateArizona
CountyPima
Point of interconnectionNorth Loop 138 kV Substation
Requested (queue) date2016-11-16
Proposed in-service date2018-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerTucson Electric Power Company

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata