West Queue Project 59 — Coal in Campbell, Wyoming

West Queue Project 59 — Coal in Campbell, Wyoming is a 285.0 MW coal interconnection project in Campbell, Wyoming with a current status of withdrawn. It is proposed to connect at North of Antelope Mine substation.

285.0 MWCapacity
WithdrawnStatus
WestMarket
CoalTechnology

Project facts

Canonical nameWest Queue Project 59 — Coal in Campbell, Wyoming
Queue ID59
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyCoal
Capacity285.0 MW
StateWyoming
CountyCampbell
Point of interconnectionNorth of Antelope Mine substation
Requested (queue) date2005-08-24
Proposed in-service date
Operational date
Withdrawn date
DeveloperTwo Elk Generation Partners, LP
Utility / transmission ownerPacifiCorp

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.