West Queue Project 59 — Coal in Campbell, Wyoming
West Queue Project 59 — Coal in Campbell, Wyoming is a 285.0 MW coal interconnection project in Campbell, Wyoming with a current status of withdrawn. It is proposed to connect at North of Antelope Mine substation.
285.0 MWCapacity
WithdrawnStatus
WestMarket
CoalTechnology
Project facts
| Canonical name | West Queue Project 59 — Coal in Campbell, Wyoming |
|---|---|
| Queue ID | 59 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | West |
| Technology | Coal |
| Capacity | 285.0 MW |
| State | Wyoming |
| County | Campbell |
| Point of interconnection | North of Antelope Mine substation |
| Requested (queue) date | 2005-08-24 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | Two Elk Generation Partners, LP |
| Utility / transmission owner | PacifiCorp |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata