West Queue Project 6 — Wind in Spokane, Washington
West Queue Project 6 — Wind in Spokane, Washington is a 150.0 MW wind interconnection project in Spokane, Washington with a current status of withdrawn. It is proposed to connect at 8th & Fancher-Latah Jct. 115 kV line or Benewah- Shawnee 230 kV line near Fairfield.
Project facts
| Canonical name | West Queue Project 6 — Wind in Spokane, Washington |
|---|---|
| Queue ID | 6 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | West |
| Technology | Wind |
| Capacity | 150.0 MW |
| State | Washington |
| County | Spokane |
| Point of interconnection | 8th & Fancher-Latah Jct. 115 kV line or Benewah- Shawnee 230 kV line near Fairfield |
| Requested (queue) date | 2007-09-14 |
| Proposed in-service date | 2009-10-01 |
| Operational date | — |
| Withdrawn date | 2009-04-20 |
| Developer | — |
| Utility / transmission owner | Avista Utilities |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata