West Queue Project 62 — Wind in Adams, Washington

West Queue Project 62 — Wind in Adams, Washington is a 123.2 MW wind interconnection project in Adams, Washington with a current status of withdrawn. It is proposed to connect at Future Neilson Switching Station.

123.2 MWCapacity
WithdrawnStatus
WestMarket
WindTechnology

Project facts

Canonical nameWest Queue Project 62 — Wind in Adams, Washington
Queue ID62
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyWind
Capacity123.2 MW
StateWashington
CountyAdams
Point of interconnectionFuture Neilson Switching Station
Requested (queue) date2018-06-08
Proposed in-service date2021-11-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerAvista Utilities

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata