West Queue Project 62 — Hydro in Teton, Montana

West Queue Project 62 — Hydro in Teton, Montana is a 11.5 MW hydro interconnection project in Teton, Montana with a current status of operational. It is proposed to connect at 69kV line between Fairfield and Bole.

11.5 MWCapacity
OperationalStatus
WestMarket
HydroTechnology

Project facts

Canonical nameWest Queue Project 62 — Hydro in Teton, Montana
Queue ID62
Statusoperational
Source statusoperational
MarketWest
TechnologyHydro
Capacity11.5 MW
StateMontana
CountyTeton
Point of interconnection69kV line between Fairfield and Bole
Requested (queue) date2007-05-25
Proposed in-service date2009-06-01
Operational date2009-06-01
Withdrawn date
Developer
Utility / transmission ownerNorthWestern Energy

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata