West Queue Project 70 — Battery in Spokane, Washington

West Queue Project 70 — Battery in Spokane, Washington is a 2.5 MW battery interconnection project in Spokane, Washington with a current status of active. It is proposed to connect at Liberty Lake 12F4.

2.5 MWCapacity
ActiveStatus
WestMarket
BatteryTechnology

Project facts

Canonical nameWest Queue Project 70 — Battery in Spokane, Washington
Queue ID70
Statusactive
Source statusactive
MarketWest
TechnologyBattery
Capacity2.5 MW
StateWashington
CountySpokane
Point of interconnectionLiberty Lake 12F4
Requested (queue) date2018-08-31
Proposed in-service date2019-01-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerAvista Utilities

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata