West Queue Project 715 — Wind in Uinta, Wyoming

West Queue Project 715 — Wind in Uinta, Wyoming is a 120.0 MW wind interconnection project in Uinta, Wyoming with a current status of active. It is proposed to connect at Canyon Compression-Railroad transmission line.

120.0 MWCapacity
ActiveStatus
WestMarket
WindTechnology

Project facts

Canonical nameWest Queue Project 715 — Wind in Uinta, Wyoming
Queue ID715
Statusactive
Source statusactive
MarketWest
TechnologyWind
Capacity120.0 MW
StateWyoming
CountyUinta
Point of interconnectionCanyon Compression-Railroad transmission line
Requested (queue) date2015-10-29
Proposed in-service date2025-01-30
Operational date
Withdrawn date
DeveloperUinta Wind Energy, LLC
Utility / transmission ownerPacifiCorp

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata